All Guides
Installing Anthracite uPVC Triple-Glazed Windows & Sills (Full House)
Buildingintermediateweekend

Installing Anthracite uPVC Triple-Glazed Windows & Sills (Full House)

by Nikos Papadopoulos

homewindows

A step-by-step analytical guide to removing old window frames and fitting new anthracite/black uPVC triple-glazed windows with matching uPVC sills across five or more openings. Written for a homeowner with some DIY experience who will work alongside a professional installer.

Supplies

Metal

Frame fixing screws

Frame fixing screws

Box of 100 — turbo/concrete frame fixings, 7.5 mm × 132 mm, corrosion-resistant (secure uPVC frame into masonry reveal)

Fixing lugs / brackets

Fixing lugs / brackets

8 galvanised steel window fixing lugs per window (alternative to face fixing where reveal is awkward)

Hardware

uPVC window units

uPVC window units

5+ made-to-measure uPVC frames with triple glazing (3 panes, 2 argon gaps), anthracite RAL 7016 / black inside and out (the windows themselves)

uPVC external sills

uPVC external sills

One anthracite uPVC sill per window, 150–225 mm deep, cut 60 mm wider than opening each side (sheds rainwater away from wall)

Sill end caps

Sill end caps

2 matching anthracite end caps per sill (close and weatherproof the sill ends)

Low-modulus silicone sealant

Low-modulus silicone sealant

6–10 cartridges, anthracite/grey and clear, 310 ml each (weatherseal frame-to-wall joint)

Expanding PU foam

Expanding PU foam

4–6 cans low-expansion gun-grade window foam, 750 ml (insulate and pack the perimeter gap)

Expanding foam tape

Expanding foam tape

2–3 rolls self-expanding weatherproof tape, 15–30 mm (compressible airtight seal around frame)

Plastic packers / shims

Plastic packers / shims

Assorted pack, 1–6 mm thicknesses (level and plumb the frame in the opening)

uPVC cleaner & protective film

uPVC cleaner & protective film

1 bottle uPVC solvent cleaner plus retained factory film (protect and clean the anthracite finish)

Finishing

Ready-mixed filler / bonding plaster

Ready-mixed filler / bonding plaster

1 tub per 2 windows (make good the internal reveal after fitting)

Trickle vents (if required)

Trickle vents (if required)

1 per window if building regulations require background ventilation (anthracite to match)

Execution · 8 steps

Step 1 of 8

Overview & planning

PLAN YOUR WINDOW PROJECT

PLAN YOUR WINDOW PROJECT
  • Count and photograph all 5 window openings
  • Confirm Phase 1 and Phase 2 schedule
  • Verify anthracite uPVC spec with installer

Instructions

• You are replacing 5+ windows with anthracite uPVC frames, triple glazing and matching uPVC sills throughout the house. • A professional installer is handling the fitting; this guide helps you understand, prepare and supervise each stage confidently. • Phase 1 removes the old frames and prepares each opening; the installer sets, levels and fixes the new frames. • Phase 2 seals, insulates, fits the external sills and makes good the reveals for a weathertight, colour-matched finish.

Time & Waiting

Active work

People

2 people

Swipe or use ← → keys

Want to follow this guide step by step or log your own build?

Open in the Makeit App